PowerGuide

Octopus Flux

Import and export rates that both swing with the time of day, built for solar with a battery.

PowerGuide is reader-supported. We may earn a commission from links on this page. It never affects our rankings or what we recommend. Learn more

Who it suits

  • Solar and battery homes that can export into the 16:00 to 19:00 peak
  • Anyone with a battery big enough to charge cheaply overnight and sell at teatime

Who it is not for

  • Solar without a battery: midday export lands in the ordinary band
  • Homes with no solar at all

Rates by region

Inc VAT, from the Octopus API on 2026-09-28. Enter a postcode to highlight your region.

Kept in your browser only; never sent to PowerGuide.

Region02:00–05:0005:00–16:0016:00–19:0019:00–02:00Standing
Eastern England (A)15.31p25.51p35.72p25.51p52.19p/day
East Midlands (B)14.54p24.22p33.91p24.22p51.06p/day
London (C)15.29p25.47p35.66p25.47p42.42p/day
Merseyside and North Wales (D)16.08p26.79p37.52p26.79p68.00p/day
West Midlands (E)14.67p24.44p34.22p24.44p57.35p/day
North East England (F)14.62p24.35p34.10p24.35p61.52p/day
North West England (G)15.17p25.27p35.38p25.27p44.93p/day
Southern England (H)15.34p25.55p35.78p25.55p47.71p/day
South East England (J)15.49p25.80p36.13p25.80p52.76p/day
South Wales (K)15.29p25.47p35.66p25.47p54.86p/day
South West England (L)15.33p25.54p35.76p25.54p56.34p/day
Yorkshire (M)14.64p24.40p34.16p24.40p61.74p/day
South Scotland (N)14.98p24.96p34.94p24.96p62.83p/day
North Scotland (P)15.36p25.59p35.83p25.59p56.29p/day

What you need

See Octopus Flux at Octopus

Assumptions

Octopus rates
Octopus Energy public API, all 14 regions, direct debit, inc VAT, snapshot 2026-09-28 (Octopus API)
Not modelled
Dual-fuel discounts, prepayment rates, business tariffs

Rates checked 20 September 2026. Check them again before you commit to anything.

Run the numbers

Default follows the DESNZ 2025/26 mean for this size band. Costs fall per kW above 4kW.

Est. annual generation
4,360 kWh
Annual benefit
£835
£574 avoided imports + £262 export on Outgoing Octopus
Payback time
8.7 yrs

Yield from PVGIS; shading is not modelled and can cost far more than the shaded fraction.

Enter a postcode for your grid region's electricity and export rates.

Questions

Is Flux better than Outgoing Octopus?
Only with a battery. Flux pays more for export in the evening peak and charges more to import then; without a battery to move energy around, the flat export rate on Outgoing is simpler and often better.
Do I need Octopus for import to get Flux export?
Yes. Flux is a paired import and export tariff on one account.